Bristol-Myers Squibb

Bristol-Myers Squibb Cleanroom Systems Project Details Date:   Value:   Location: Dublin Client/Main Contractor   Sector: Data Centre / Food / Pharma   Size:   Duration: Approximately   Brief of service provided / Delivery: As part of a large scale pharmaceutical development, Holden were engaged to design and build end product storage facility. The project …

Read full post

BRU01 Phase 2

BRU01 Phase2 Data Centre Project Details Date: 2023 Value: €1.2 million Location: Tate Structural Ceilings, Tate Suspended HAC’s Client/Main Contractor Edge Connexx / Winthrop Sector: Data Centre / Food / Pharma Data Centre Size: 3 data halls Duration: Approximately 6 months Brief of service provided / Delivery:  Tate structural ceilings, Tate suspended HACs Share on …

Read full post

Clonakilty Black Pudding

Clonakilty Black Pudding Food Hygiene Systems Project Details Date:   Value:   Location: Cork Client/Main Contractor Clonakilty Black Pudding Sector: Data Centre / Food / Pharma Food Size:  10,000 square foot Duration: Approximately 16 weeks Brief of service provided / Delivery:  As one of Ireland leading artisan brands, synonymous with the West Cork Food movement, …

Read full post

Panelto Foods

Panelto Foods Food Hygiene Systems Project Details Date:   Value:   Location: Longford Client/Main Contractor Panelto Foods Sector: Data Centre / Food / Pharma Food Size:  4500m2 Duration: Approximately   Brief of service provided / Delivery:  4500m2 extension to the floor space of an existing manufacturing facility, comprising of 16000m2 of walls fire rated and …

Read full post

TINE | Food Hygiene Systems

TINE Food Hygiene Systems Project Details Date:   Value:   Location: Cork Client/Main Contractor TINE  Sector: Data Centre / Food / Pharma Food Size:  19,000m2 Duration: Approximately   Brief of service provided / Delivery:  This project consisted of a new cheese production facility, comprising of 19,000m2 of walls and ceilings to production, temperature control and …

Read full post

Boston Scientific – Cleanroom Systems

Boston Scientific Cleanroom Systems Project Details Date: 2021 Value:   Location:   Client/Main Contractor Boston Scientific Sector: Data Centre / Food / Pharma Pharma Size:   Duration: Approximately   Brief of service provided / Delivery: Cleanroom upgrade from non classified to achieve ISO class/classification. Holden were tasked with the design and installation of a new …

Read full post

WAW 03 Ballard

WAW 03 Ballard Data Centre Project Details Date: 2022 Value: €7.0 million Location: Poland Client/Main Contractor Microsoft – Mercury Engineering Poland Sector: Data Centre / Food / Pharma Data Centre Size: Hyperscale 19.6 MW Duration: Approximately 1 year  Brief of service provided/delivery:  Holden works consisted of design, supply, and install of whitewall panels (mineral wool …

Read full post

GTR

GTR Data Centre Project Details Date: 2022 Value: €15.1 million Location: London Client/Main Contractor Mercury Engineering Sector: Data Centre / Food / Pharma Data Centre Size: 40.5MW Duration: Approximately 2 years Brief of service provided / Delivery: The project consisted of the fit-out of  3 x 5,373 square metre data centres with white wall paneling, …

Read full post

MIL07

MIL07 Data Centers Project Details Date: 2023 Value: 4.5m Location: Milan Client/Main Contractor Enterprise Sector: Data Centre / Food / Pharma Data Size:   Duration: Approximately   Brief of service provided / Delivery: The relationship between geometry and architectural design are described and discussed along some examples. Geometry is the fundamental science of forms and …

Read full post