Blog

Bristol-Myers Squibb

Bristol-Myers Squibb Cleanroom Systems As part of a large scale pharmaceutical development Holden were engaged to design and build end product storage facility. The project scope called for a range of rooms varying in temperature from ambient to -30 degrees. Bristol-Myers Squibb Insight Studio Location Dublin Services Cleanroom Systems The project scope called for a …

Read full post

BRU01 Phase 2

BRU01 Phase2 Data Centre Project Details Tate Structural Ceilings, Tate Suspended HAC’s Date: 2023 Value: €1.2 million Location: Tate Structural Ceilings, Tate Suspended HAC’s Client/Main Contractor Edge Connexx / Winthrop Sector: Data Centre / Food / Pharma Data Centre Size: 3 data halls Duration: Approximately 6 months Brief of service provided / Delivery:     …

Read full post

Clonakilty Black Pudding

Clonakilty Black Pudding Food Hygiene Systems As one of Ireland leading artisan brands, synonymous with the West Cork Food movement, the building of CBP new state of the art facility in the town of Clonakilty was a marquee project. Holden were awarded the contract for the full internal fit out of walls, ceiling, doors, wall …

Read full post

Panelto Foods

Panelto Foods Food Hygiene Systems 4500m2 extension to the floor space of an existing manufacturing facility, comprising of 16000m2 of walls fire rated and non-fire rated, freezer, ceilings , doors (rapid roll, sliding and hinged). Client Panelto Foods Location Longford Size 4500m2 4500m2 extension to the floor space of an existing manufacturing facility, comprising of …

Read full post

TINE | Food Hygiene Systems

TINE Food Hygiene Systems This project consisted of a new cheese production facility, comprising of 19,000m2 of walls and ceilings to production, temperature control and fire rated areas. Holden also supplied and installed internal and external doors, both personnel and sectional in type, as well as wall and door protection bollards and kerbs. TIME Insight …

Read full post

Boston Scientific – Cleanroom Systems

Boston Scientific Cleanroom Systems Project brief Cleanroom upgrade from non classified to achieve ISO class 7 classification. Holden were tasked with the design and installation of a new walk on cleanroom ceiling with integrated HEPA filters and new highly efficient LED dimmable light fittings. Low level air return ducting encasements and cleanroom removable walls. The …

Read full post

WAW 03 Ballard

WAW 03 Ballard Data Centre Project Details Holden works consisted of design, supply, and install of whitewall panels (mineral wool sandwich panels), mechanical mesh, freestanding Heat Aisle Containment Systems, secondary steel structure for containments and services, ceilings (Zentia and TATE), and Assa Abloy fire rated doors. Date: 2022 Value: €7.0 million Location: Poland Client/Main Contractor …

Read full post

GTR

GTR Data Centre Project Details The project consisted of the fit-out of  3 x 5,373 square metre data centres with white wall paneling, dry lining, doors, security entrance doors, ballistic walls, raised access flooring, epoxy flooring, beam and column fire protective encasement, tiling, flooring vinyl and carpet, decoration, mineral and load bearing ceilings. Date: 2022 …

Read full post

MIL07

MIL07 Data Centers The relationship between geometry and architectural design are described and discussed along some examples. Geometry is the fundamental science of forms and their order. Geometric figures, forms and transformations build the material of architectural design. In the history of architecture geometric rules based on the ideas of proportions and symmetries formed fixed …

Read full post
1 2 3