Boston Scientific

Cleanroom Systems

Project brief

Cleanroom upgrade from non classified to achieve ISO class 7 classification. Holden were tasked with the design and installation of a new walk on cleanroom ceiling with integrated HEPA filters and new highly efficient LED dimmable light fittings. Low level air return ducting encasements and cleanroom removable walls. The new ceiling suspension had to be installed around a very congested ceiling void area with many existing services remaining. Gowning room, viewing room and Material airlock upgrades were also included in the brief.

Client

Boston Scientific

Date

28 Aug 2021

Services

Clean Rooms

Holden were tasked with the design and installation of a new walk on cleanroom ceiling with integrated HEPA filters and new highly efficient LED dimmable light fittings.

Solution/Delivery

Our Holden team worked on a design whereby the ceiling constructability would allow Terminal housings remain in their same locations, which was a client requirement. Constructability of the ceiling suspension around an extremely congested service area was completed with integrated scaffolding ensuring Holden H&S standards were adhered to. Light lux calculations were also calculated to achieve the client requirement throughout the rooms. Our vastly experienced construction team, completed the project on time to a very high standard and with the highest H&S standards

"Our vastly experienced construction team, completed the project on time to a very high standard and with the highest H&S standardsn."

Dave Russell, MD, Holden

"Hush, the babies are sleeping, the farmers, the fishers, schoolteacher, pensioners, and a publican."

Michale Vouge
Share on