BRU01 – Phase 1

BRU01 Phase 1 Data Centre Project Details Holden were tasked with the installation of a new greenfield data centre fitout involving Kingspan Tate ceiling grid in COLO 1 and 3 separate IDF rooms. The scope also involved the installation of 14 number full sized floor to ceiling HACS in Colo one with 3 number smaller …

Read full post

LD 7.2

LD 7.2 Data Centre Project Details Large multi story enterprise data centre on extremly restricted site in Slough. Holden designed, supplied and fitted FR composit wall panel, FR doors, structural grid ceiling, and floor finishes within a tight programme. Key challenge on this project was the sequencing due to restricted traffic routes. Holden offered solutions …

Read full post

LD 10.1

LD 10.1 Data Centre Project Details On this project Holden designed, suppled and installed composit FR walls and ceiling panels within an existing Data Centre capus. The key challenge was deivering within a constraint multi story site with restricted acess around live Colo’s. Holden developed project specific solutions through desing and installation expertese to be …

Read full post

Telehouse Phase 2

Telehouse Phase 2 Data Centre Project Details The brief included working in and around existing server rooms in a live environment, therefore access and loading out of plant and materials required a significant effort on planning and programming of works. Client achieved their milestone dates and on budget. Date: 2020 Value: €0.3 million Location: London …

Read full post

Telehouse Phase 1

Telehousr Phase 1 Data Centre Project Details Multi story entaprise data centre in a very restricted site in Canary Warf. Holden desinged, supplied and delivered a complex arrangement of mesh, fire rated wall, doors, and structural grid ceiling. Key challenge on this project was designing solutions for complicated interfaces that could be installed in the …

Read full post

BCN-01

BCN – 01 Data Centre Project Details Tate Structural Ceilings, Tate Suspended HAC’s, Kingspan Quadcore Wall Panel KS1100CS, Security Mesh, Door Package, Fire rated drywall in admin and stairwells Date: 2021 Value: €2.3 million Location: Barcelona Client/Main Contractor Edge Connexx / Winthrop Sector: Data Centre / Food / Pharma Data Centre Size:   Duration: Approximately …

Read full post

Cyrus One

Cyrus One Data Centre Project Details Holden were tasked with the design development and installation of 60min fire rated walls including 60min fire rated doors. The door brief included doors that had to meet the specified security lock requirement while maintaining the required fire rating. Date: 2019 Value: €0.9 million Location: Dublin Client/Main Contractor Structuretone …

Read full post

GVX11

GVX11 Data Centre Project Details On this project Hoolden designed, supplied and installed FR walls, Composite panel ceilings, Lay-in-grid ceilings and specialised access hatches. The key challenge on this project was mobalising in an extreamly tight timframe to meet clients needs by exacuting and accelerated design and procurement process. Date: 2020 Value: €1.7 million Location: …

Read full post

AMS 11/12

AMS Data Centre Project Details Large hyperscal DC. Holden designed, supplied and fitted a cobination of lay in grid ceiling and structural grid ceilings over a number of building. While the sequancing and coordination with othere contractors was the challange oin this project all milestones were met to the highest quality by the Holden management …

Read full post

Project Edge

Project Edge Data Centre Project Details Hyperscale project in Dublin. Holden designed, supplied and installed a walk op ceiling across a multi story data centre that include large indepantanlty supported HAC. Fast track project with complex sequencing delivered on time to the highest quality Date: 2012 Value: €2.9 million Location: Dublin Client/Main Contractor BAM/PM/Google Sector: …

Read full post