MIL01 & 02
MIL01 & 02 Data Centers Project Details Date: 2022/23 Value: 8m Location: Milan Client/Main Contractor Sector: Data Centre / Food / Pharma Data Centre Size: Duration: Approximately Brief of service provided / Delivery:
MIL01 & 02 Data Centers Project Details Date: 2022/23 Value: 8m Location: Milan Client/Main Contractor Sector: Data Centre / Food / Pharma Data Centre Size: Duration: Approximately Brief of service provided / Delivery:
BRU01 Phase 1 Data Centre Project Details Date: 2022 Value: €1.1 million Location: Brussels Client/Main Contractor Winthrop Sector: Data Centre / Food / Pharma Data Centre Size: 1600m2 Tate ceiling/14 numbers HACS/ Duration: Approximately 14 weeks Brief of service provided / Delivery: Holden were tasked with the installation of a new greenfield data centre fitout …
LD 7.2 Data Centre Project Details Large multi story enterprise data centre on an extremely restricted site in Slough. Holden designed, supplied and fitted FR composite wall panel, FR doors, structural grid ceiling, and floor finishes within a tight programme. The key challenge on this project was the sequencing due to restricted traffic routes. Holden …
LD 10.1 Data Centre Project Details On this project Holden designed, supplied and installed composite FR walls and ceiling panels within an existing Data Centre campus. The key challenge was delivering within a constrained multi storey site with restricted access around live Colo’s. Holden developed project specific solutions through design and installation expertise to be …
Telehouse Phase 2 Data Centre Project Details The brief included working in and around existing server rooms in a live environment, therefore access and loading out of plant and materials required a significant effort on planning and programming of works. Client achieved their milestone dates and on budget. Date: 2020 Value: €0.3 million Location: London …
Telehouse Phase 1 Data Centre Project Details Multi story enterprise data centre in a very restricted site in Canary Warf. Holden designed, supplied and delivered a complex arrangement of mesh, fire rated wall, doors, and structural grid ceiling. The key challenge on this project was designing solutions for complicated interfaces that could be installed in …
BCN – 01 Data Centre Project Details Tate Structural Ceilings, Tate Suspended HAC’s, Kingspan Quadcore Wall Panel KS1100CS, Security Mesh, Door Package, Fire rated drywall in admin and stairwells. Date: 2021 Value: €2.3 million Location: Barcelona Client/Main Contractor Edge Connexx / Winthrop Sector: Data Centre / Food / Pharma Data Centre Size: Duration: Approximately …
Cyrus One Data Centre Project Details Holden were tasked with the design development and installation of 60mm fire rated walls including 60mm fire rated doors. The door brief included doors that had to meet the specified security lock requirement, while maintaining the required fire rating. Date: 2019 Value: €0.9 million Location: Dublin Client/Main Contractor Structuretone …
GVX11 Data Centre Project Details On this project Holden designed, supplied and installed FR walls, composite panel ceilings, lay-in-grid ceilings and specialized access hatches. The key challenge on this project was mobilizing in an extremely tight timeframe to meet clients needs by exacting and accelerated design and procurement process. Date: 2020 Value: €1.7 million Location: …
AMS Data Centre Project Details Large hyperscale DC. Holden designed, supplied and fitted a combination of lay in grid ceilings and structural grid ceilings over a number of buildings. While the sequencing and coordination with other contractors was the challenge on this project, all milestones were met to the highest quality by the Holden management …