BRU01 Phase 2

BRU01 Phase2 Data Centre Project Details Date: 2023 Value: €1.2 million Location: Tate Structural Ceilings, Tate Suspended HAC’s Client/Main Contractor Edge Connexx / Winthrop Sector: Data Centre / Food / Pharma Data Centre Size: 3 data halls Duration: Approximately 6 months Brief of service provided / Delivery:  Tate structural ceilings, Tate suspended HACs Share on …

Read full post

WAW 03 Ballard

WAW 03 Ballard Data Centre Project Details Date: 2022 Value: €7.0 million Location: Poland Client/Main Contractor Microsoft – Mercury Engineering Poland Sector: Data Centre / Food / Pharma Data Centre Size: Hyperscale 19.6 MW Duration: Approximately 1 year  Brief of service provided/delivery:  Holden works consisted of design, supply, and install of whitewall panels (mineral wool …

Read full post

GTR

GTR Data Centre Project Details Date: 2022 Value: €15.1 million Location: London Client/Main Contractor Mercury Engineering Sector: Data Centre / Food / Pharma Data Centre Size: 40.5MW Duration: Approximately 2 years Brief of service provided / Delivery: The project consisted of the fit-out of  3 x 5,373 square metre data centres with white wall paneling, …

Read full post

MIL07

MIL07 Data Centers Project Details Date: 2023 Value: 4.5m Location: Milan Client/Main Contractor Enterprise Sector: Data Centre / Food / Pharma Data Size:   Duration: Approximately   Brief of service provided / Delivery: The relationship between geometry and architectural design are described and discussed along some examples. Geometry is the fundamental science of forms and …

Read full post

MIL01 & 02

MIL01 & 02 Data Centers Project Details Date: 2022/23 Value:  8m Location: Milan Client/Main Contractor   Sector: Data Centre / Food / Pharma Data Centre Size:   Duration: Approximately   Brief of service provided / Delivery:  

Read full post

BRU01 – Phase 1

BRU01 Phase 1 Data Centre Project Details Date: 2022 Value: €1.1 million Location: Brussels Client/Main Contractor Winthrop Sector: Data Centre / Food / Pharma Data Centre Size: 1600m2 Tate ceiling/14 numbers HACS/ Duration: Approximately 14 weeks Brief of service provided / Delivery: Holden were tasked with the installation of a new greenfield data centre fitout …

Read full post

LD 7.2

LD 7.2 Data Centre Project Details Large multi story enterprise data centre on an extremely restricted site in Slough. Holden designed, supplied and fitted FR composite wall panel, FR doors, structural grid ceiling, and floor finishes within a tight programme. The key challenge on this project was the sequencing due to restricted traffic routes. Holden …

Read full post

LD 10.1

LD 10.1 Data Centre Project Details On this project Holden designed, supplied and installed composite FR walls and ceiling panels within an existing Data Centre campus. The key challenge was delivering within a constrained multi storey site with restricted access around live Colo’s. Holden developed project specific solutions through design and installation expertise to be …

Read full post

Telehouse Phase 2

Telehouse Phase 2 Data Centre Project Details The brief included working in and around existing server rooms in a live environment, therefore access and loading out of plant and materials required a significant effort on planning and programming of works. Client achieved their milestone dates and on budget. Date: 2020 Value: €0.3 million Location: London …

Read full post

Telehouse Phase 1

Telehouse Phase 1 Data Centre Project Details Multi story enterprise data centre in a very restricted site in Canary Warf. Holden designed, supplied and delivered a complex arrangement of mesh, fire rated wall, doors, and structural grid ceiling. The key challenge on this project was designing solutions for complicated interfaces that could be installed in …