Bristol Myers Squibb

Project Details

Client:       Bristol-Myers Squibb

Location:  Dublin

Duration:  5 Months

Project Description

Scope of Works:


Construction of two -40˚C freezers inside a 150mm fire rated Rockwool panel wall.  Construction of 8 separate chill rooms 2 ˚C , including the supply and installation of freezer grade fire rated emergency escape doors and a combination of freezer grade rapid roll doors and fire curtains for goods access.




The details for freezers and those to meet the required fire rating can quite often be in conflict with each other. The main challenge on this project was coordinating the details from each of the major elements to ensure neither freezer or fire rating performance was compromised.