BCN-01

BCN – 01 Data Centre Project Details Tate Structural Ceilings, Tate Suspended HAC’s, Kingspan Quadcore Wall Panel KS1100CS, Security Mesh, Door Package, Fire rated drywall in admin and stairwells. Date: 2021 Value: €2.3 million Location: Barcelona Client/Main Contractor Edge Connexx / Winthrop Sector: Data Centre / Food / Pharma Data Centre Size:   Duration: Approximately …

Read full post

Cyrus One

Cyrus One Data Centre Project Details Holden were tasked with the design development and installation of 60mm fire rated walls including 60mm fire rated doors. The door brief included doors that had to meet the specified security lock requirement, while maintaining the required fire rating. Date: 2019 Value: €0.9 million Location: Dublin Client/Main Contractor Structuretone …

Read full post

GVX11

GVX11 Data Centre Project Details On this project Holden designed, supplied and installed FR walls, composite panel ceilings, lay-in-grid ceilings and specialized access hatches. The key challenge on this project was mobilizing in an extremely tight timeframe to meet clients needs by exacting and accelerated design and procurement process. Date: 2020 Value: €1.7 million Location: …

Read full post

AMS 11/12

AMS Data Centre Project Details Large hyperscale DC. Holden designed, supplied and fitted a combination of lay in grid ceilings and structural grid ceilings over a number of buildings. While the sequencing and coordination with other contractors was the challenge on this project, all milestones were met to the highest quality by the Holden management …

Read full post

Project Edge

Project Edge Data Centre Project Details Hyperscale project in Dublin. Holden designed, supplied and installed a walk op ceiling across a multi story data centre that include large independently supported HAC. This was a fast track project with complex sequencing delivered on time to the highest quality. Date: 2012 Value: €2.9 million Location: Dublin Client/Main …

Read full post

Project Gemini

Project Gemini Data Centre Solutions Holden were tasked with the internal fit out solution of a Data Centre facility in Blanchardstown, Dublin. The scope of works included fire rated composite panel, fire rated steel doors, hot aisle corridors, wall protection for the composite panel suspended and panel ceilings to 6 data halls including switch and …

Read full post

Canary Wharf

Canary Wharf Data Centre Solutions Holden was contracted to undertake the internal fit out of 2 floors for a data centre facility. Client Mercury Engineering Location London Services Data Center Holden as already having completed projects in the UK laid foundations for this project to be successful and smooth. Scope of works included fire rated …

Read full post