Holden Delivers for Cork Internet Exchange Data Centre

Project Details       Client:        Cork Internet Exchange Location:   Cork Size:            3000m²             Project Description Holden recently installed fire proof compartmentalization to five separate rooms for Cork Internet Exchange new data centre facility, Hollyhill, Cork. One of the rooms contained 4MVA […]

Almarai Saudi Arabia | New Bakery Facility

Project Details       Client:       Almarai Food Company Location: Saudi Arabia Project Description The Middle East’s leading dairy company Almarai have engaged with Holden for support on the composite panel elements of their new builds. We are currently on site in Northern Saudi Arabia working on an extension to their existing bakery facility. […]

All in All Ingredients | Food Production Facility

Project Details     Client:        All in All Ingredients Location:   Dublin Size:          1400m²   Project Description Holden were recently contracted by All in All Ingredients to construct 1400m² of composite panel for their new food production plant in Dublin. The project included many different elements such as integrated […]

Glanbia Portlaoise | Distribution Chill

Project Details     Client:         Glanbia AgriBusiness Location:    Portlaoise Duration:    3 Months         Project Description Holden were contracted by Glanbia to design, supply and install the composite panel envelope of their new distribution chill as well as the associated two fire rated fork lift charging area. The […]

Keelings Food Market Building

Project Details   Client:          Keelings Location:     Dublin Size:              5000m² Project Description Holden crews have recently commenced works for the development of Keelings 250-acre food industry park, Dublin. 19.5 m lengths of composite panel safely arrived on site and is currently being installed.  

Project Gemini | Data Centre

Project Details   Client:      Project Gemini Location: Dublin Size:          8000m²     Project Description Holden Installations was recently awarded the contract to supply and install rockwool core composite panels and fire rated doors for the construction of 6 new data halls in Dublin.  We are currently in the final […]

Food and Drink Expo, CityWest

Holden Installations Limited in partnership with Steril Systems, recently exhibited at the Food and Drink Conference & Exhibition, held in CityWest, Dublin last week. Here, we had on display a range of UV-C (Ultra Violet) disinfection devices which are an ideal solution for the food manufacturing industry, proven to significantly reduce microbial count of bacteria […]

Bristol Myers Squibb

Project Details Client:       Bristol-Myers Squibb Location:  Dublin Duration:  5 Months Project Description Scope of Works:   Construction of two -40˚C freezers inside a 150mm fire rated Rockwool panel wall.  Construction of 8 separate chill rooms 2 ˚C , including the supply and installation of freezer grade fire rated emergency escape doors and […]

Clonee Data Centre | Rockwool Core Composite Panel

Project Details Client:      Clonee Data Centre Location: Clonee, Co. Meath Size:          2100m² Duration: 8 Months Project Description Scope of work Holden Installations recently completed the supply and installation of 2100m² rockwool core composite panel to form 58 air shafts for the services of the data halls. The contract included […]

Trade Mission of the Gulf Region – 2017

Holden Attended a Week Long Trade Mission to the Gulf States, Lead by Michael Creed, TD. Holden Installations Managing Director, Dave Russell was invited to be part of a group trade visit to the Gulf region last February. The event organised by Enterprise Ireland and lead by the Minister for agriculture, food and the marine, […]