Doing Our Bit For Charity

Last month the team at Holden Installations Limited together with its sister company Thermo Door Limited suppled and installed a fire escape door for Pieta House, Cork.  As a good will gesture we decided to supply and fit the door as a charitable donation for this worthy cause. Pieta House tackle issues of suicide and […]

ARCHITECTURE EXPO 2016

HOLDEN INSTALLATIONS LIMITED WINS TWO MAJOR RIAI AWARDS AT THE ARCHITECTURE EXPO 2016 Holden Installations Limited has recently been awarded for two of their Panel Protection Systems products at the 2016 Architecture Expo which was held in the RDS, Dublin last November. These Architects Choice Product Awards were awarded for Holden’s Bollards and Guardrails and […]

Glanbia Ingredients | Floor Mounted Bumper Rails

Project Details       Client:      Glanbia Ingredients Location: Ballyragget, Co. Killenny Area:         Powder Handling Facility Duration: 2 Days   Project Description Holden Installations Limited were commissioned by the Glanbia Engineering team, Malone O’Regan Consulting Engineers & Ormonde Construction to supply and fit Holden’s double guardrail panel protection system. […]

Protech Plastics | Clean Room Wall Panels

Project Details   Client: Location: Size: Duration:   Protech Plastics Little Island 2225m² 3 Months Project Description   Holden Installation’s Limited recently supplied and installed Clean Room Wall Panels, Ceiling Panels and a range of rapid access personnel doors to form the envelope of a new Clean Room for Protech Plastics new state-of-the-art food grade […]

Pepsico | Composite Fire Rated Panel Walls

Project Details       Client: Location: Size: Duration:       Pepsico Cork 1100m² 6 Weeks Project Description Holden recently installed rockwool composite fire rated panel walls and ceilings to form a process area of up to 14.5m height for Pepsico’s new BCP Extension, Carrigaline, Cork. The installation of such hire fire rated walls […]

Kerrygold Ornua | Insulated Panels & Walk-on Ceiling Systems

Project Details     Client: Location: Size: Duration:     Kerrygold – Ornua Mitchelstown 4668m² 5 Months Project Description Holden were contracted to install insulated wall panels & walk-on ceiling systems for Ornua’s new butter production and packing facility for its iconic brand, Kerrygold, in Mitchelstown, Co. Cork.   Solutions Provided by Holden   Fire […]

Kerry Foods | Bollards and Bump Rail Systems

Project Details     Client: Location: Duration:     Kerry Foods Shilleagh, Co. Wicklow 1.5 Days Project Description Holden Installations supplied and fitted their new Bollards Bump Rail Systems in Kerry Foods, Shillelagh Co. Wicklow. These consist of over 25 Bollards, Double Bump Rails and Single Guardrails. All are extremely high impact resistant that has a […]

Loughnanes of Galway | Crash Barrier Systems

Project Details   Client: Location: Duration:   Loughanane’s of Galway Galway Less than 1 Day Project Description Holden Installations are delighted to have the opportunity to work with Loughnanes of Galway earlier this year. Loughnanes of Galway are famous throughout Ireland for their Quality and Award winning Sausages and Puddings. This Family run Business goes back […]