Bristol Myers Squibb

Project Details Client:       Bristol-Myers Squibb Location:  Dublin Duration:  5 Months Project Description Scope of Works:   Construction of two -40˚C freezers inside a 150mm fire rated Rockwool panel wall.  Construction of 8 separate chill rooms 2 ˚C , including the supply and installation of freezer grade fire rated emergency escape doors and […]

MSD Carlow

Project Details Client:        MSD, Carlow Location:   Carlow Size: Duration:  4 Months   Project Description Scope of Works:   Construction of two -40ºC freezers with and adjoining -20ºC freezer vestibule with all PIR panel walls and ceilings meeting a one hour fire rating. This included the supply and installation of freezer grade […]